SUM stops responding
SUM takes more time to deploy updates than expected.
SUM stops responding when performing inventory on a baseline.
SUM shuts down unexpectedly.
SUM does not generate any dependency and fails to install when downgrading from iLO 5 1.15 to iLO 5 1.10.
Solution 1Action
Try the following actions.
Launch SUM.
Run
clean-cache
, and then launch SUM.Shut down the SUM engine. Use the command
smartupdate shutdownengine
from the SUM directory.Restart the computer and run SUM again.
Solution 2Cause
Action
SUM might not have system or network resources.
Do not deploy more than the 50 nodes at a time, or 10 VMware nodes at a time.
Solution 3Cause
Action
Performing inventory on more than one baseline might use too many system resources.
Perform inventory on one SPP baseline at a time.
Solution 4Cause
Action
SUM does not show any dependency and fails to install because SUM 8.5 does not support iLO downgrade.
Perform the downgrade outside of SUM. Extract iLO 5 Smart Component to a directory and then upload the firmware binary file directly using the iLO 5 interface.